Norwind Gale TBN arrives at Vard Brattvåg.

Image of the ship Norwind Gale sailing with a small tug boat by its side.

On Friday January 6th, Norwind Gale arrived at Vard Brattvåg – as the first boat in a series of four to be delivered by Vard. The boat is to be equipped and completed for delivery on 15 May 2023.

Previous
Previous

Norwind Offshore takes delivery of the Norwind Gale

Next
Next

The launching of Norwind Gale.